IndustrialSurat, GujaratCompleted · 2024
Apex Textiles Factory
Textile manufacturer
150 kW industrial rooftop offsets 80% of daytime factory load with projected ROI in 4.2 years.
System Capacity
150 kW
Solar Panels
280
Annual Generation
225K kWh
CO₂ Offset / Year
150t
Annual Savings
₹18.0L
Project Overview
Large-scale rooftop installation across a 12,000 sq ft textile manufacturing facility. The bifacial panel layout maximizes yield on the metal deck roof while the monitoring system tracks per-string performance for proactive maintenance.
Services Delivered
SolarMaintenance
Project Timeline
- 1
Load analysis & engineering
2 weeks
- 2
Civil & mounting work
3 weeks
- 3
Electrical & commissioning
1 week
Equipment Used
- 550W bifacial panels
- 150 kW central inverter
- Lightning protection
- SCADA monitoring